Phones:

+7 (342) 261-38-69

 

 

Big Data No. 48 The Constuction of Gas-Turbine Power Plants in Russia in years 1980-2016

Abstract

 

Big Data No. 48 The Construction of Gas-Turbine Power Plants in Russia in years 1980-2016 developed in July and issue version 07.2017. Big Data No. 48 (version 08.2017) issue in August, 2017. The information has been included in Big Data No. 48 (version 08.2017) under the realized projects of micro turbine power plants in 2004-2016.

 

Big Data 48 consists of 3 parts.

The part 1 includes characteristics of the projects realized and realizable by the enterprises of electric power industry and the industry (except for gas-and oil-extracting).

The part 2 has characteristics of the projects of construction auxiliary gas-turbine power plants realized on oil and gas fields.

The part 3 contains the review of installations of micro turbine plants in Russia in 2004-2016.

 

Projects have following characteristics (at presence of the information): the simple or co-generation cycle; the installed electric capacity; the installed thermal capacity; the location; the aim of construction; the building owner or the investor; developer; the general contractor; the date of putting; the period of construction; the primary generative equipment; the compressor system; the type of fuel and another.

 

Characteristics of Big Data

 

Issue - August, 2017.

Volume - 134 pages.

Language - Russian. Can be translated into another language for an additional fee.

Big Data is on sale in printed and electronic versions.

Printed form - A4 booklet.

Electronic form in .PDF file with the size of 2.1 MB.

Price of electronic version is 69480 RUB.

 

Demo-version Big Data 48, version 08.2017 (Russian, PDF, 0.33 MB) 

More information  (in Russian).